{"id":11066,"date":"2018-01-10T11:00:31","date_gmt":"2018-01-10T19:00:31","guid":{"rendered":"http:\/\/www.palada.net\/index.php\/2018\/01\/10\/news-4837\/"},"modified":"2018-01-10T11:00:31","modified_gmt":"2018-01-10T19:00:31","slug":"news-4837","status":"publish","type":"post","link":"http:\/\/www.palada.net\/index.php\/2018\/01\/10\/news-4837\/","title":{"rendered":"7 Tips for Successful DCIM Deployments: A User\u2019s Perspective from Peak 10 + ViaWest Data Centers"},"content":{"rendered":"<p><strong>Credit to Author: Victor Avelar| Date: Wed, 10 Jan 2018 17:55:27 +0000<\/strong><\/p>\n<p>I recently had the pleasure of having dinner with Dan Harman, Building Automation Systems Engineer at Peak 10 + ViaWest. Dan\u2019s has many years of first-hand experience with deploying data center infrastructure management (<a href=\"https:\/\/blog.schneider-electric.com\/?feed-stats-url=aHR0cDovL3d3dy5zY2huZWlkZXItZWxlY3RyaWMuY29tL2IyYi9lbi9zb2x1dGlvbnMvc3lzdGVtL3M0L2RhdGEtY2VudGVyLWFuZC1uZXR3b3JrLXN5c3RlbXMtZGNpbS8%3D&#038;feed-stats-url-post-id=44584\" target=\"_blank\" rel=\"noopener\">DCIM<\/a>).\u00a0 In our conversation it became clear to me that a successful implementation depends on much more than technology and project management.\u00a0 I took away some key advice for anyone looking to implement a DCIM solution.\u00a0 Since it\u2019s always good to hear what\u2019s worked for others, and the fact that he\u2019s happy for me to share the love via this blog, here are 7 tips:<\/p>\n<p> <img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-44602 alignright\" src=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2018\/01\/Peak-10-Small-300x200.png\" alt=\"DCIM\" width=\"300\" height=\"200\" srcset=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2018\/01\/Peak-10-Small-300x200.png 300w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2018\/01\/Peak-10-Small.png 420w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/> <\/p>\n<ol>\n<li><strong>Source through distribution channels<\/strong><br \/> One of the primary reasons for the chosen DCIM solution by Peak 10 + ViaWest was that it could be procured through distribution channels as well as authorized integrator\/ resellers. The channel provides a more competitive pricing environment without any pressure from an integrator to perform an onsite assessment or pushing to sell services.<\/li>\n<li><strong>Be vendor agnostic<\/strong><br \/> Peak 10 + ViaWest has a heterogeneous data center portfolio composed of both home grown data centers and those through acquisitions in different markets. Consequently, the facilities are diverse in terms of design and equipment selections, demanding a data center infrastructure management solution architected to connect with, monitor, and communicate with a wide variety of different manufacturer\u2019s products.<\/li>\n<li><strong>Start small<\/strong><br \/> Peak 10 + ViaWest started the implementation with a small amount of funding (&lt;$50,000). Large DCIM implementation projects, sometimes costing millions of dollars, changes the game and brings with it pressure from upper management to minimize the risks and deliver results quickly. If that\u2019s not bad enough, you also must contend with resistance from facility managers who feel they are being forced and rushed into adopting something new.\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0<a href=\"https:\/\/blog.schneider-electric.com\/?feed-stats-url=aHR0cHM6Ly93d3cuc2NobmVpZGVyLWVsZWN0cmljLmNvbS9wcm9tby91cy9lbi9nZXRQcm9tby83NTU3NFA%3D&#038;feed-stats-url-post-id=44584\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-44599 size-full\" src=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2018\/01\/998-20145035_GMA-US_620x350.png\" alt=\"\" width=\"620\" height=\"350\" srcset=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2018\/01\/998-20145035_GMA-US_620x350.png 620w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2018\/01\/998-20145035_GMA-US_620x350-300x169.png 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/a><\/li>\n<li><strong>Begin by monitoring priorities<\/strong><br \/> In this case the effectiveness of the cooling system was the priority, so Dan and his team installed temperature sensors in cold aisles (NB: water leakage sensors around the cooling tower came later). This left enough of the budget to invest in other things like monitoring cards for the UPS\u2019s and standby generators.<\/li>\n<li><strong>Be human and get buy-in<\/strong><br \/> Implementing a DCIM solution successfully is largely about understanding human behavior. Without genuine buy-in from the facility managers that use the software, any DCIM solution will eventually fail to provide the benefits it promises. So, never force a DCIM solution on your team. At Via West, one of the facility managers at first rejected the proposed solution. An open and honest discussion revealed that a previous employer had imposed a new DCIM solution on the team without prior consultation resulting in resentment.<\/li>\n<li><strong>Share the knowledge around<\/strong><br \/> Be prepared to demonstrate how DCIM can help the facility managers simplify their jobs and make them more effective. At Peak 10 + ViaWest, this meant Dan working closely with the team to overcome objections and work on the features that were going to be the most beneficial.<\/li>\n<li><strong>Communicate the quick wins<\/strong><br \/> Quick wins will win over support for the new DCIM solution and will get facility managers to consistently engage with DCIM data. At Peak 10 + ViaWest, one of the facility managers was tracking the rack temperatures of a high-density pod and noticed that every week, at the same time, the temperatures would be elevated. This prompted an investigation that led to the discovery of a CRAH unit with a known bug that was turning the unit off.<\/li>\n<\/ol>\n<p>What\u2019s interesting for me and my colleagues in the Data Center Science Center is that much of Dan\u2019s counsel follows the advice contained in Schneider Electric white paper 170 written by our own Patrick Donovan. Click the link to download <a href=\"https:\/\/blog.schneider-electric.com\/?feed-stats-url=aHR0cHM6Ly9jbGljay5wc3RtcmsuaXQvMm0vd3d3LmFwYy5jb20lMkZ3cCUyRiUzRndwJTNEMTcwL3FuSlhDUUUvSVBJL19ka1BQUnlLejMvUTI5VElFNWxkeUJEYjIxdFpXNTA%3D&#038;feed-stats-url-post-id=44584\" target=\"_blank\" rel=\"noopener\">\u201cAvoiding Common Pitfalls of Evaluating and Implementing DCIM Solutions\u201d<\/a>.<\/p>\n<p>  <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/blog.schneider-electric.com\/?feed-stats-post-id=44584\" width=\"1\" height=\"1\" style=\"display: none;\" \/><\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\/datacenter\/dcim\/2018\/01\/10\/dcim-deployments-peak-10-viawest-data-centers\/\">7 Tips for Successful DCIM Deployments: A User\u2019s Perspective from Peak 10 + ViaWest Data Centers<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n<p><a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/dcim\/2018\/01\/10\/dcim-deployments-peak-10-viawest-data-centers\/\" target=\"bwo\" >http:\/\/blog.schneider-electric.com\/feed\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Credit to Author: Victor Avelar| Date: Wed, 10 Jan 2018 17:55:27 +0000<\/strong><\/p>\n<p>I recently had the pleasure of having dinner with Dan Harman, Building Automation Systems Engineer at Peak 10 + ViaWest. Dan\u2019s has many years of first-hand experience with deploying data&#8230;  <a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/dcim\/2018\/01\/10\/dcim-deployments-peak-10-viawest-data-centers\/\" title=\"Read7 Tips for Successful DCIM Deployments: A User\u2019s Perspective from Peak 10 + ViaWest Data Centers\">Read more &#187;<\/a><\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\/datacenter\/dcim\/2018\/01\/10\/dcim-deployments-peak-10-viawest-data-centers\/\">7 Tips for Successful DCIM Deployments: A User\u2019s Perspective from Peak 10 + ViaWest Data Centers<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[12389,12388],"tags":[12391,12402,12403,12401,17136,17137,12826,17138],"class_list":["post-11066","post","type-post","status-publish","format-standard","hentry","category-scadaics","category-schneider","tag-data-center","tag-data-center-infrastructure-management","tag-data-center-management","tag-dcim","tag-dcim-implementation","tag-facility-managers","tag-lifeison","tag-peak-10-viawest"],"_links":{"self":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/11066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/comments?post=11066"}],"version-history":[{"count":0,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/11066\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/media?parent=11066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/categories?post=11066"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/tags?post=11066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}