{"id":14708,"date":"2019-02-27T11:00:10","date_gmt":"2019-02-27T19:00:10","guid":{"rendered":"https:\/\/www.palada.net\/index.php\/2019\/02\/27\/news-8457\/"},"modified":"2019-02-27T11:00:10","modified_gmt":"2019-02-27T19:00:10","slug":"news-8457","status":"publish","type":"post","link":"http:\/\/www.palada.net\/index.php\/2019\/02\/27\/news-8457\/","title":{"rendered":"6 Steps to Get Predictive Maintenance Ready"},"content":{"rendered":"<p><strong>Credit to Author: Ludovic Debuchy| Date: Tue, 26 Feb 2019 19:48:30 +0000<\/strong><\/p>\n<p><strong>The true cost of unplanned downtime<\/strong><\/p>\n<p> <img loading=\"lazy\" decoding=\"async\" class=\"wp-image-55121 alignright\" src=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1.jpg\" alt=\"\" width=\"259\" height=\"259\" srcset=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1.jpg 1200w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1-150x150.jpg 150w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1-300x300.jpg 300w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1-768x768.jpg 768w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1-1024x1024.jpg 1024w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/02\/998-20278546_GMA_US_2_1200X1200-1-125x125.jpg 125w\" sizes=\"auto, (max-width: 259px) 100vw, 259px\" \/> <\/p>\n<p>In industrial and manufacturing environments, equipment failures can significantly affect the bottom line. In fact, analysts have found that downtime can cost the average factory between 5 and 20 percent of its productive capacity<a href=\"#_ftn1\" name=\"_ftnref1\">[1]<\/a>. Unreliable equipment costs multiply exponentially when you add downtime, lost production, cost of repair, replacement, loss of quality, safety risks and disappointed customers.<\/p>\n<p><strong>A smarter approach to put you back in control of your operation<\/strong><\/p>\n<p>Technology advancements such as IoT sensors are enabling machines to connect to software and provide recommendations to employees to act before a failure occurs. This process is called predictive maintenance, where connected and integrated data is monitored to determine the condition of in-service<\/p>\n<p>equipment to estimate the true health of the equipment and detect abnormal behaviors, risk of failure or change in settings.<\/p>\n<p><span style=\"color: #008000\"><em>\u00a0<\/em><em>Predictive Maintenance increases the life expectancy of your assets, reducing downtime and ensuring continuous equipment availability and peak performance. <\/em><\/span><\/p>\n<p>Moving from reactive or planned maintenance strategies to a predictive maintenance strategy can seem overwhelming. The below checklist was designed for teams to prioritize actions to get predictive maintenance ready in 2019.<\/p>\n<p><strong>Your checklist to get predictive maintenance ready:<\/strong><\/p>\n<ul>\n<li>Perform an audit of electrical infrastructure to gauge equipment performance, needs and prioritize critical actions.<\/li>\n<li>Develop a plan to modernize equipment- determine what to keep, what to retrofit, where to add sensors to gather needed data.<\/li>\n<li>Install equipment and software based on plan, ensuring standards are met and data integrated for analysis.<\/li>\n<li>Train staff on new equipment and data to ensure adoption of technology.<\/li>\n<li>Monitor data by high level of experts using analytics to benchmark, track progress and predict faults before they happen.<\/li>\n<li>Act on notifications dispatch remote or on-site interventions to prevent failures and increase reliability.<\/li>\n<\/ul>\n<p>There are multiple benefits for implementing a predictive maintenance strategy including better protection for maintenance staff by avoid emergency maintenance, reduced downtime, prevention of unnecessary maintenance, reduced costs and new insights available across the enterprise.<\/p>\n<p><strong>Are you predictive <\/strong><strong>maintenance ready?<\/strong><\/p>\n<p><a href=\"https:\/\/www.schneider-electric.ca\/en\/work\/campaign\/predictivemaintenance\/#\">Learn more about solutions in Canada<\/a>:<\/p>\n<p><a href=\"#_ftnref1\" name=\"_ftn1\">[1]<\/a> <a href=\"https:\/\/www.ptc.com\/en\/product-lifecycle-report\/iot-slashes-downtime-with-predictive-maintenance\">https:\/\/www.ptc.com\/en\/product-lifecycle-report\/iot-slashes-downtime-with-predictive-maintenance<\/a><\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\/building-management\/2019\/02\/26\/6-steps-to-get-predictive-maintenance-ready\/\">6 Steps to Get Predictive Maintenance Ready<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n<p><a href=\"https:\/\/blog.schneider-electric.com\/building-management\/2019\/02\/26\/6-steps-to-get-predictive-maintenance-ready\/\" target=\"bwo\" >http:\/\/blog.schneider-electric.com\/feed\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Credit to Author: Ludovic Debuchy| Date: Tue, 26 Feb 2019 19:48:30 +0000<\/strong><\/p>\n<p>The true cost of unplanned downtime In industrial and manufacturing environments, equipment failures can significantly affect the bottom line. In fact, analysts have found that downtime can cost the average&#8230;  <a href=\"https:\/\/blog.schneider-electric.com\/building-management\/2019\/02\/26\/6-steps-to-get-predictive-maintenance-ready\/\" title=\"Read6 Steps to Get Predictive Maintenance Ready\">Read more &#187;<\/a><\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\/building-management\/2019\/02\/26\/6-steps-to-get-predictive-maintenance-ready\/\">6 Steps to Get Predictive Maintenance Ready<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[12389,12388],"tags":[12425,1642,12426,12548],"class_list":["post-14708","post","type-post","status-publish","format-standard","hentry","category-scadaics","category-schneider","tag-building-management","tag-canada","tag-energy-managementenergy-efficiency","tag-predictive-maintenance"],"_links":{"self":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/14708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/comments?post=14708"}],"version-history":[{"count":0,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/14708\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/media?parent=14708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/categories?post=14708"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/tags?post=14708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}