{"id":15269,"date":"2019-05-07T11:00:03","date_gmt":"2019-05-07T19:00:03","guid":{"rendered":"http:\/\/www.palada.net\/index.php\/2019\/05\/07\/news-9018\/"},"modified":"2019-05-07T11:00:03","modified_gmt":"2019-05-07T19:00:03","slug":"news-9018","status":"publish","type":"post","link":"http:\/\/www.palada.net\/index.php\/2019\/05\/07\/news-9018\/","title":{"rendered":"Getting the Most Bang for Your Buck with Data Center Modernization"},"content":{"rendered":"<p><strong>Credit to Author: Mark Hurley| Date: Tue, 07 May 2019 15:00:00 +0000<\/strong><\/p>\n<p>Ten years ago, the iPad didn\u2019t exist, we connected via a <a href=\"https:\/\/blog.schneider-electric.com\/co-location\/2019\/01\/09\/why-5g-future-and-beyond-depends-on-telco-edge\/\" target=\"_blank\" rel=\"noopener noreferrer\">3G network<\/a>, and Gartner put <a href=\"https:\/\/www.gartner.com\/doc\/1108412\/gartners-hype-cycle-special-report\" target=\"_blank\" rel=\"noopener noreferrer\">cloud in its hype cycle<\/a>. Clearly, much has changed including data center technology. But as assets age, it\u2019s hard to know where to prioritize your <a href=\"https:\/\/www.schneider-electric.com\/en\/work\/campaign\/modernization-services\/overview.jsp\" target=\"_blank\" rel=\"noopener noreferrer\">data center modernization<\/a> efforts to get the most bang for your buck. I explored this topic during a webinar hosted by IDG, <em><a href=\"https:\/\/it-resource.schneider-electric.com\/cloud-service-providers\/idg-webinar-optimizing-cost-risk\" target=\"_blank\" rel=\"noopener noreferrer\">Optimizing Data Center Revenue, Cost &amp; Risk.<\/a><\/em><\/p>\n<p>If you are building a new data center, you should be deploying a cost and risk optimized solution. However, if you have an aging data center, you are likely not operating at the same efficiency and risk profile as a new data center being deployed today. This places you at a competitive disadvantage.<\/p>\n<p>The big question you should be asking is \u2013 how should I modernize my data center to improve costs and reduce risk? Essentially, there are three areas of focus for <a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2017\/04\/06\/data-center-modernization-cost-justify\/\" target=\"_blank\" rel=\"noopener noreferrer\">data center modernization<\/a>: equipment (electrical and mechanical infrastructure), systems (EPMS, BMS, DCIM) and operations (operate maintain, monitor).<\/p>\n<p><iframe loading=\"lazy\"  src=\"https:\/\/www.youtube.com\/embed\/FfnS1QcRq2g\" width=\"100%\" height=\"420\" frameborder=\"0\" ><\/iframe> <\/p>\n<h2>Where to Focus Your Data Center Modernization Effort<\/h2>\n<p>If you look at the typical data center, 80 percent of the annual P&amp;L costs are associated with mechanical\/electrical utilities and the depreciation of your CapEx investment. If you have already built your data center, it probably does not make sense to replace these capital investments unless the equipment has been fully depreciated and reached the end of its useful life. However, when it comes time to replace your data center equipment, you should be evaluating technologies that are more efficient and reduce operations risk.<\/p>\n<p>From an OpEx perspective, the annual utility costs could easily be the highest expense line item on your P&amp;L statement next to the depreciation on your capital investment. Therefore, deploying highly efficient technologies should be a top focus of any modernization effort. This can be accomplished when replacing aged assets, or it may involve adding new technologies that were not available\/incorporated into the original design.<\/p>\n<h2>Getting the Most for Your Money<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-56671\" src=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/05\/Modernization_jpg_ZTjv7X32-300x200.jpg\" alt=\"Shot of computer programmers looking through data in the office\" width=\"300\" height=\"200\" srcset=\"https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/05\/Modernization_jpg_ZTjv7X32-300x200.jpg 300w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/05\/Modernization_jpg_ZTjv7X32-768x512.jpg 768w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/05\/Modernization_jpg_ZTjv7X32-1024x683.jpg 1024w, https:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2019\/05\/Modernization_jpg_ZTjv7X32.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>All data centers, new or old, should focus on reducing the overall energy consumption and improving the Power Utilization Effectiveness (PUE). For example, a reduction in your PUE from 1.8 to 1.5 in a 1MW data center will result in $262.000 per year in annual utility savings (based on average cost per KW of 10 cents).<\/p>\n<p>Start with fixing the basics; such as, adjusting temperature and humidity set points, installing hot\/cold aisle containment solution. If you are modernizing an existing data center or <a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2018\/12\/21\/3-lessons-from-habitat-for-humanity-for-building-data-centers\/\" target=\"_blank\" rel=\"noopener noreferrer\">building a new<\/a> data center, you can take it a step further.<\/p>\n<p>Staffing presents additional savings opportunity. While it might make sense for large colocation providers to staff 7&#215;24, smaller facilities less than 1MW in size can leverage technology \u2014 control systems, automation, monitoring, alarming and alerting \u2014 to support a Monday through Friday, 9 to 5 model. A cloud-enabled monitoring service, such as <a href=\"https:\/\/www.schneider-electric.com\/en\/work\/services\/field-services\/critical-power-and-cooling\/operate\/asset-advisor\/\" target=\"_blank\" rel=\"noopener noreferrer\">EcoStruxure Asset Advisor<\/a>, can provide flexible, anywhere\/anytime access to check a data center\u2019s status and health.<\/p>\n<p>Moving from <em>frequency-based\u00a0<\/em>maintenance to <em>condition-based\u00a0<\/em>maintenance could reduce the amount of maintenance performed on equipment and reduce cost. Perhaps, maintenance on non-critical data center systems or equipment could be performed on weekdays instead of weekends for additional savings. \u00a0With condition-based maintenance, <a href=\"https:\/\/www.schneider-electric.com\/en\/work\/services\/field-services\/building-services\/building-advisor\/optimize\/\" target=\"_blank\" rel=\"noopener noreferrer\">EcoStruxure Building Advisor<\/a> and <a href=\"https:\/\/www.schneider-electric.com\/en\/product-range-presentation\/65478-ecostruxure%E2%84%A2-power-advisor\/\" target=\"_blank\" rel=\"noopener noreferrer\">EcoStruxure Power Advisor<\/a> can enable the data center operations to align with the life cycle of the data center.<\/p>\n<h2>Use Leading Edge Technology for Modernizing Your Data Center<\/h2>\n<p>Think about implementing more leading edge technology like a high efficiency modular UPS, indirect evaporative cooling, <a href=\"https:\/\/www.schneider-electric.com\/en\/work\/solutions\/for-business\/data-centers-and-networks\/cloud-based-dcim-software-dmaas\/\" target=\"_blank\" rel=\"noopener noreferrer\">DCIM solutions<\/a> or <a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2019\/01\/29\/could-2019-finally-year-data-center-management-as-a-service\/\" target=\"_blank\" rel=\"noopener noreferrer\">software defined<\/a> power.<\/p>\n<p>Or take for example, <a href=\"https:\/\/www.schneider-electric.com\/en\/download\/document\/APC_VAVR-A5AJXY_EN\/\">lithium-ion batteries which are a strong alternative<\/a> to traditional lead acid batteries. Main benefits include: 30 to 50 percent lower TCO, 60 to 70 percent less weight, 40 to 60 percent smaller footprint, 10x the number of cycles and 2 to 3x life expectancy over VRLA batteries.<\/p>\n<p>New technologies like these will significantly impact the operational efficiency of a data center and help manage risk. <a href=\"https:\/\/it-resource.schneider-electric.com\/cloud-service-providers\/idg-webinar-optimizing-cost-risk\" target=\"_blank\" rel=\"noopener noreferrer\">I go into greater detail about technology innovations<\/a> you can use in your data center in the webinar we held with IDC \u2013 and demonstrate how you can gain a competitive advantage to support your digital transformation with an <a href=\"https:\/\/www.schneider-electric.us\/en\/work\/campaign\/innovation\/overview.jsp\" target=\"_blank\" rel=\"noopener noreferrer\">EcoStruxure<\/a> software solution. <a href=\"https:\/\/it-resource.schneider-electric.com\/cloud-service-providers\/idg-webinar-optimizing-cost-risk\" target=\"_blank\" rel=\"noopener noreferrer\">Watch it OnDemand now<\/a>!<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2019\/05\/07\/getting-the-most-bang-for-your-buck-with-data-center-modernization\/\">Getting the Most Bang for Your Buck with Data Center Modernization<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n<p><a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2019\/05\/07\/getting-the-most-bang-for-your-buck-with-data-center-modernization\/\" target=\"bwo\" >http:\/\/blog.schneider-electric.com\/feed\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Credit to Author: Mark Hurley| Date: Tue, 07 May 2019 15:00:00 +0000<\/strong><\/p>\n<p>Ten years ago, the iPad didn\u2019t exist, we connected via a 3G network, and Gartner put cloud in its hype cycle. Clearly, much has changed including data center technology. But&#8230;  <a href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2019\/05\/07\/getting-the-most-bang-for-your-buck-with-data-center-modernization\/\" title=\"ReadGetting the Most Bang for Your Buck with Data Center Modernization\">Read more &#187;<\/a><\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\/datacenter\/2019\/05\/07\/getting-the-most-bang-for-your-buck-with-data-center-modernization\/\">Getting the Most Bang for Your Buck with Data Center Modernization<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[12389,12388],"tags":[12391,12394],"class_list":["post-15269","post","type-post","status-publish","format-standard","hentry","category-scadaics","category-schneider","tag-data-center","tag-data-center-modernization"],"_links":{"self":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/15269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/comments?post=15269"}],"version-history":[{"count":0,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/15269\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/media?parent=15269"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/categories?post=15269"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/tags?post=15269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}