{"id":10017,"date":"2017-10-20T11:00:04","date_gmt":"2017-10-20T19:00:04","guid":{"rendered":"http:\/\/www.palada.net\/index.php\/2017\/10\/20\/news-3790\/"},"modified":"2017-10-20T11:00:04","modified_gmt":"2017-10-20T19:00:04","slug":"news-3790","status":"publish","type":"post","link":"https:\/\/www.palada.net\/index.php\/2017\/10\/20\/news-3790\/","title":{"rendered":"Calculate Your Best Cost Option for Aging Switchgear"},"content":{"rendered":"<p><strong>Credit to Author: Luiz Simoes| Date: Fri, 20 Oct 2017 17:53:03 +0000<\/strong><\/p>\n<p>Hello again! My last blog,<a href=\"http:\/\/blog.schneider-electric.com\/?feed-stats-url=aHR0cDovL2Jsb2cuc2NobmVpZGVyLWVsZWN0cmljLmNvbS9zZXJ2aWNlcy8yMDE3LzA4LzExL2Nsb3Nlci1sb29rLXRydWUtY29zdC1yZXBsYWNpbmctZWxlY3RyaWNhbC1zd2l0Y2hnZWFyLw%3D%3D&#038;feed-stats-url-post-id=42446\" target=\"_blank\" rel=\"noopener\"> <em>A Closer Look into the True Cost of Replacing Electrical Switchgear<\/em>,\u00a0<\/a>addressed concerns facility engineers face with their aging low-voltage and medium-voltage switchgear. As you can see below, these largely center around safety, reliability and productivity:<\/p>\n<ul>\n<li>Spare parts are difficult to locate and expensive to purchase since they are priced as an aftermarket product.<\/li>\n<li>Unreliable equipment causes unplanned downtime and lost productivity, which raises the cost of ownership.<\/li>\n<li>Slow opening times in aging circuit breakers increase the arc flash hazard, causing safety concerns.<\/li>\n<li>Arc chutes of old circuit breakers contain asbestos, adding to safety concerns for maintenance personnel.<\/li>\n<li>Circuit breaker mechanisms need lubrication or reconditioning to reduce friction \/ overheating, an early indicator of potential issues.<\/li>\n<li>Low- and medium-voltage circuit breakers are beyond their expected useful life.<\/li>\n<\/ul>\n<p>When facility engineers deem that ongoing maintenance for aging switchgear is no longer a reasonable course of action, they need to decide whether to replace or upgrade existing equipment. Recommended factors to include in their decision-making process include:<\/p>\n<ol>\n<li>the operating environment<\/li>\n<li>the impact of downtime<\/li>\n<li>cost of ongoing maintenance<\/li>\n<li>availability, and cost, of spare parts<\/li>\n<li>the need to increase fault or continuous current rating<\/li>\n<li>location of the existing switchgear<\/li>\n<li>unforeseen project surprises (addressed in my first blog)<\/li>\n<\/ol>\n<p>A <a href=\"mailto:luiz.simoes@schneider-electric.com?subject=I\"ve%20read%20your%20blog%20post.%20Please%20send%20me%20the%20Modernization%20Calculator.\" target=\"_blank\" rel=\"noopener\">Modernization Calculator<\/a> has been developed to assist facility engineers in the \u2018upgrade or replace\u2019 decision. User-friendly and intuitive, the calculator evaluates a facility\u2019s substations and prioritizes options by total installed cost and lead time.<\/p>\n<div id=\"attachment_42447\" style=\"width: 516px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-42447\" title=\"cost savings for MV and LV switchgear\" src=\"http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Electrical-switchgear-upgrades_Modernization-tool_1-300x126.png\" alt=\"cost of upgrading electrical switchgear\" width=\"506\" height=\"213\" srcset=\"http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Electrical-switchgear-upgrades_Modernization-tool_1-300x126.png 300w, http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Electrical-switchgear-upgrades_Modernization-tool_1-768x322.png 768w, http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Electrical-switchgear-upgrades_Modernization-tool_1-1024x429.png 1024w, http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Electrical-switchgear-upgrades_Modernization-tool_1.png 1576w\" sizes=\"auto, (max-width: 506px) 100vw, 506px\" \/><\/p>\n<p class=\"wp-caption-text\">Compare cost savings for modernization projects<\/p>\n<\/div>\n<p>Additional features include:<\/p>\n<ul>\n<li>Default values that can be changed by project needs.<\/li>\n<li>Calculates cost to maintain (#) circuit breakers in the switchgear in a 12-year period, by adjusting cycle times for aging or new circuit breakers.<\/li>\n<li>Summarizes installed cost of each of the above options in a report that also details how each addresses cost, safety, reliability and downtime.<\/li>\n<li>Individual substation reports can be downloaded, saved, printed or emailed.<\/li>\n<\/ul>\n<p> <a href=\"mailto:luiz.simoes@schneider-electric.com?subject=I\"ve%20read%20your%20blog%20post.%20Please%20send%20me%20the%20Modernization%20Calculator.\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-42448 size-full\" src=\"http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Blog_electrical-switchgear-upgrades_modernization-tool_CTA_2.jpg.png\" alt=\"electrical switchgear upgrades\" width=\"646\" height=\"220\" srcset=\"http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Blog_electrical-switchgear-upgrades_modernization-tool_CTA_2.jpg.png 646w, http:\/\/blog.schneider-electric.com\/wp-content\/uploads\/2017\/10\/Blog_electrical-switchgear-upgrades_modernization-tool_CTA_2.jpg-300x102.png 300w\" sizes=\"auto, (max-width: 646px) 100vw, 646px\" \/><\/a> <\/p>\n<p>The <a href=\"mailto:luiz.simoes@schneider-electric.com?subject=I\"ve%20read%20your%20blog%20post.%20Please%20send%20me%20the%20Modernization%20Calculator.\" target=\"_blank\" rel=\"noopener\">Modernization Calculator<\/a> is an excellent tool to help optimize CapEx and OpEx funds. In addition, a short <a href=\"http:\/\/blog.schneider-electric.com\/?feed-stats-url=aHR0cDovL3d3dy5zZXJlbGF5cy5jb20vdG9vbHMvc3dpdGNoZ2Vhci1zZXJ2aWNlcy1xdWl6L2xvZ2luLmh0bWw%3D&#038;feed-stats-url-post-id=42446\" target=\"_blank\" rel=\"noopener\">quiz<\/a> has been developed that addresses a facility\u2019s specific pain points and provides a recommended action plan. Having the calculator documentation and quiz results available to present to management during budget planning sessions should make the maintain, upgrade or replace discussion go smoothly and result in a clearly-defined action plan.<\/p>\n<p>&nbsp;<\/p>\n<p>  <img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/blog.schneider-electric.com\/?feed-stats-post-id=42446\" width=\"1\" height=\"1\" style=\"display: none;\" \/><\/p>\n<p>The post <a rel=\"nofollow\" href=\"http:\/\/blog.schneider-electric.com\/services\/2017\/10\/20\/calculate-best-cost-option-aging-switchgear\/\">Calculate Your Best Cost Option for Aging Switchgear<\/a> appeared first on <a rel=\"nofollow\" href=\"http:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n<p><a href=\"http:\/\/blog.schneider-electric.com\/services\/2017\/10\/20\/calculate-best-cost-option-aging-switchgear\/\" target=\"bwo\" >http:\/\/blog.schneider-electric.com\/feed\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Credit to Author: Luiz Simoes| Date: Fri, 20 Oct 2017 17:53:03 +0000<\/strong><\/p>\n<p>Hello again! My last blog, A Closer Look into the True Cost of Replacing Electrical Switchgear,\u00a0addressed concerns facility engineers face with their aging low-voltage and medium-voltage switchgear. As you can&#8230;  <a href=\"http:\/\/blog.schneider-electric.com\/services\/2017\/10\/20\/calculate-best-cost-option-aging-switchgear\/\" title=\"ReadCalculate Your Best Cost Option for Aging Switchgear\">Read more &#187;<\/a><\/p>\n<p>The post <a rel=\"nofollow\" href=\"http:\/\/blog.schneider-electric.com\/services\/2017\/10\/20\/calculate-best-cost-option-aging-switchgear\/\">Calculate Your Best Cost Option for Aging Switchgear<\/a> appeared first on <a rel=\"nofollow\" href=\"http:\/\/blog.schneider-electric.com\">Schneider Electric Blog<\/a>.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[12389,12388],"tags":[13589,15994,14332,13591,12431,13092,12396,12858,12446,15995,12386,15996],"class_list":["post-10017","post","type-post","status-publish","format-standard","hentry","category-scadaics","category-schneider","tag-aging-switchgear","tag-cost-savings","tag-electrical-distribution-equipment","tag-electrical-switchgear","tag-energy-management","tag-energy-savings","tag-innovationateverylevel","tag-modernization","tag-power-management","tag-schneider-electric-services","tag-services","tag-switchgear-upgrades"],"_links":{"self":[{"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/10017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/comments?post=10017"}],"version-history":[{"count":0,"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/posts\/10017\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/media?parent=10017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/categories?post=10017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palada.net\/index.php\/wp-json\/wp\/v2\/tags?post=10017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}