services

ScadaICSSchneider

Overcome Mixed-OEM Challenges with Switchgear Modernization

Credit to Author: Doug Robling| Date: Mon, 02 Oct 2017 14:00:05 +0000

Limited capital budgets require aging power equipment to be maintained for as long as possible. But there’s also an ongoing need for optimal reliability: System downtime costs organizations millions of… Read more »

The post Overcome Mixed-OEM Challenges with Switchgear Modernization appeared first on Schneider Electric Blog.

Read More
ScadaICSSchneider

Why asset management starts with a strategic maintenance plan

Credit to Author: David Morte| Date: Fri, 01 Sep 2017 08:08:54 +0000

What are your biggest operational worries? If your first thought was “equipment failure,” you’re not alone. Equipment is at the heart of business operations and failure can not only affect… Read more »

The post Why asset management starts with a strategic maintenance plan appeared first on Schneider Electric Blog.

Read More
ScadaICSSchneider

A Closer Look into the True Cost of Replacing Electrical Switchgear

Credit to Author: Luiz Simoes| Date: Fri, 11 Aug 2017 17:29:09 +0000

During my switchgear modernization presentations all over the US, I am constantly reminded of the concerns customers face with their aging electrical infrastructure. For the most part, these center around… Read more »

The post A Closer Look into the True Cost of Replacing Electrical Switchgear appeared first on Schneider Electric Blog.

Read More
ScadaICSSchneider

NFPA 70E and NEC: Aging Equipment in the Era of Arc Flash

Credit to Author: Gabriel Arce| Date: Fri, 30 Jun 2017 12:46:46 +0000

The need to operate electrical equipment safely, without impacting facility operation, has been a priority for electrical engineers and maintenance personnel for many decades. Initially, much of the focus was… Read more »

The post NFPA 70E and NEC: Aging Equipment in the Era of Arc Flash appeared first on Schneider Electric Blog.

Read More